Cincinnati, Ohio
At Back Municipal Consulting, we don’t just write specifications — we create clear, enforceable documents that protect municipalities and ensure trenchless rehabilitation projects are successful.
Our specs are built from over 30 years of trenchless experience and are written to:
Every specification is aligned with the latest ASTM, NASSCO, AWWA, and ASCE standards, including requirements for design, installation, QA/QC, and acceptance testing.
Ambiguity in specs often leads to change orders and contractor claims. BMC eliminates gray areas by defining performance criteria, testing requirements, and product compliance clearly.
We embed detailed requirements for resin saturation logs, curing records, vacuum testing, adhesion testing, CCTV verification, and material submittals. This ensures municipalities get what was paid for — not just what was installed.
No two systems are the same. BMC customizes specifications to address site-specific conditions such as groundwater infiltration, lateral reinstatement, structural classification, and long-term service life.
Grouting & Infiltration Control: Specs for chemical grout applications, verification testing, and acceptance.
Our specs are not boilerplate. They are living documents that reflect the latest standards, lessons from the field, and the realities of construction. That’s why municipalities and engineers trust BMC to prepare specifications that lead to successful bids, fewer disputes, and long-lasting infrastructure.


Member Benefits:
