Cincinnati, Ohio

Sewer Rehab Product Selection

Choosing the right rehabilitation product shouldn’t feel like a gamble. BMC evaluates your inspection data, project conditions, and compliance requirements to recommend the most effective, standards-aligned solution for your system.

Why This Service Matters

Selecting the wrong sewer rehabilitation product can have long-term consequences:

What BMC Provides

Objective, product-agnostic evaluation

Standards compliance review (ASTM, NASSCO, AWWA, ASCE)

Condition-driven recommendations aligned with actual field conditions

Side-by-side product comparison with risks, strengths, and QA/QC factors

Engineering-backed recommendations from 32+ years of trenchless experience

Deliverables suitable for bid packages, design documentation, and internal review

Detailed Service Compenents

Clipboard with a to-do list and a blue gear icon, symbolizing settings or configuration tasks

Product Compatibility Assessment

Every product has limitations—BMC ensures they align with your system.
Includes:

  • Fit-for-purpose analysis for CIPP, geopolymer, cementitious, epoxy, and hybrid solutions

     

  • Evaluating curing, chemical resistance, thickness, and bonding requirements

     

  • Installation feasibility and constructability
Document icon with a ruler across it and a checkmark badge, indicating verified/approved paperwork.

Standards & Specification Alignment

We verify compliance with required standards and contract documents.
Includes:

  • ASTM, NASSCO, AWWA, and ASCE alignment

  • Spec compliance and conflict identification

  • Verification of manufacturer claims

  • QA/QC requirements to prove installation success
Two smartphones side by side with arrows between them and a magnifying glass in front, symbolizing comparison or inspection.

Side-by-Side Product Comparison

Clear comparisons to support confident decision-making.
Includes:

  • Strength, service life, and corrosion resistance

  • Installation complexity and risk factors

  • Cost and long-term O&M implications

  • QA/QC expectations

  • Contractor capability considerations
Document with a blue border and a circular blue approval stamp featuring a checkmark, indicating approved or certified status.

Final Recommendation & Documentation

You receive a clear, defensible written recommendation.
Includes:

  • Written evaluation with engineering justification

  • Summary of standards alignment

  • Recommended product(s) and alternatives

  • Documentation suitable for bid packages or internal review

How BMC Works With You

  1. Review inspection data, system needs, and goals

  2. Analyze field conditions and applicable standards

  3. Compare the most viable rehabilitation products

  4. Deliver a clear written recommendation

  5. Provide support during bidding, construction, or submittal review if needed

Who This Service Is For

Municipalities

Ensure long-term system performance and reduce project risk.

Engineers

Strengthen designs with objective, compliant, field-driven recommendations.

CCTV Operators & Assessment Teams

Use results to align rehab planning with actual system condition.

Contractors

Minimize uncertainty, avoid change orders, and ensure product suitability.

Attorneys / Claims Review

Defensible engineering documentation for product disputes or failures.

Manufacturers

Independent review for spec compliance or “or equal” submissions.

Why BMC?

FAQs

How long does the process take?

 Typically 1–2 weeks, depending on data volume and complexity.

Yes — BMC aligns product recommendations with your existing specs or updates them if inconsistencies exist.

Yes. We provide unbiased compliance reviews to prevent non-compliant substitutions.

Yes, BMC can help verify product compliance and QA/QC during all phases.

CCTV data, PACP/MACP/LACP reports, project goals, soil/groundwater details, and relevant specs.

Ready to choose the right rehabilitation product with confidence?

Poster advertising a Water & Wastewater Safety Workshop with event dates, schedule blocks, sponsorship details, and a yellow safety icon.

Thank you for joining BMC Trenchless’ FREE Priority List.

Member Benefits:

  • Register 3 days before open webinar registration begins.
  • Guaranteed seating in all 1-hour education sessions.
  • Member ONLY education sessions.
  • First to know about new education sessions & events.
  • PDH/CEU Savings!