Cincinnati, Ohio
Engineered designs you can trust — stamped by a P.E. licensed in all 50 states.
BMC delivers trenchless rehabilitation designs that are clear, compliant, constructible, and tailored to real-world conditions—not theoretical assumptions.
In trenchless rehab, design errors don’t stay on paper—they show up in the ground.
When P.E. designs are incomplete, outdated, or misaligned with field conditions, municipalities face:


We produce fully engineered CIPP designs for mainlines, laterals, and connections.
Includes:
Stamped design package for bid or construction

Structural and corrosion-resistant designs to restore manhole integrity.
Includes:

Engineered designs for pressure pipe lining (Class IV structural or semi-structural).
Includes:

Not all systems can be solved with a standard spec.
Includes:

Ensure long-term system performance and reduce project risk.
Strengthen designs with objective, compliant, field-driven recommendations.
Use results to align rehab planning with actual system condition.
Minimize uncertainty, avoid change orders, and ensure product suitability.
Defensible engineering documentation for product disputes or failures.
Independent review for spec compliance or “or equal” submissions.

Most standard designs take 1–3 weeks depending on scope and data quality.
CCTV, MACP, soil data, groundwater info, previous failures, and any existing drawings.
Yes—BMC regularly reviews and stamps designs for municipalities and engineering firms.
Yes, BMC can help verify product compliance and QA/QC during all phases.
CCTV data, PACP/MACP/LACP reports, project goals, soil/groundwater details, and relevant specs.

Member Benefits:
