Cincinnati, Ohio

BMC Trenchless Hosted

Large Diameter Pipe Rehabilitation Full Day Webinar

Focused on large-diameter pipe, this recorded, moderator-led webinar delivers a series of strategically curated educational sessions designed to help participants better prepare for their next project. Industry experts share practical insight on inspection and cleaning techniques, rehabilitation technologies, and other key considerations, along with real-world field experience and two dedicated Q&A sessions.

Advanced Pipeline Assessment Using Autonomous Technology & Sensors

This presentation will discuss the use of advanced pipeline assessment technologies including autonomous technologies using artificial intelligence robots with multiple sensors to better understand the condition of the existing underground infrastructure.

Sam Cancilla

Over 30 years of experience in the water and wastewater trenchless technology industry. Managed condition assessment projects in over 500 of the largest major US and Canadian cities. B.S. from the University of Pittsburgh and is a member of various industry groups including NASSCO, ASTM, AWWA, NASST, WEA & WEF.

Drone Inspection For Large Diameter Sewer

See one of the newest, safest, effective ways to inspect Large Diameter Pipes. The presentation covers the capabilities of drones specifically designed for confined spaces.

Glen Fowler

Glenn has more than 30 years of experience in civil engineering related infrastructure projects between military and secular service. He has managed the trenchless repair of more than 250,000 LF of pipes and more than 150,000 FT of vertical structures using more than 75,000 tons of high strength repair mortars. Glenn is a graduate of Southern Polytechnic State University with a Bachelor of Science in Civil Engineering Technology.

 

Large Diameter Sewer Cleaning

The periodic inspection of manholes’ structural integrity is crucial to prevent costly and potentially hazardous damages. However, the traditional method of sending operators in for direct visual inspection can quickly become a big expenditure and also inefficiently allocates resources that are often scarce and required for other important tasks. In order to efficiently integrate a regular manhole inspection program, municipalities need a fast and effective solution that will allow them to perform a full survey of their manhole network while maintaining the impact on their manpower as low as possible.

Joe Schotthoefer

A fifth-generation family-owned business. Joe is the current President of the Board of Directors at NASSCO. Joe is a mechanical engineer by education, but field engineering specialist by trade. Joe crafted his skills on the shop floor, at the job site and in the pipe. He is responsible for the custom manufacture and continuous improvement of the company’s fleet of water recycling large diameter, long reach, difficult access and high-pressure pipe cleaning and debris extraction machines.

 

CIPP Onsite/Over the Hole Wet Out

Learn the process involved in an onsite wet out. Covered is the required footprint, ingress egress, environmental controls, bypass, water, equipment recommendations, risk assessment & duration times frames.  

Lou Krch

ITCPâ„¢- Cured-In-Place Pipe (CIPP) Trainer | 39 years of CIPP experience | 2000 to Present | Operations Manager, Granite Construction (Formerly Layne Inliner) Ohio Region | 1999 to 2000 | Project Manager, Miller Pipeline | 1983 to 1999 | TV Truck Operator promoted to Operations Manager, Insituform New England | Certified NASSCO Trainer in ITCPâ„¢-CIPP since 2016.

 

Large Diameter Rehab Using Bespoke Structural GRP Lining System

This presentation will go over the rehabilitation of circular, non-circular sewers, bends, curves and drop structures with custom GRP lining systems.

Andy Sherwin

Over 25 years of experience in sewer maintenance and rehabilitation technics. Particularly cured in place pipe lining, lateral lining, Grouted in Place Panel Lining and manhole rehabilitation. Has been involved in some of the largest lateral rehabilitation projects in
Canada to date.

 

Internal Joint Seals for Large Pipe

Learn about a turnkey process that’s simple and used in pipelines carrying any product and any shape—including pipes with compound angles.  

Jeremy Keininger

Jeremy Kieninger is the Superintendent for the WEKO-SEAL team at Miller Pipeline. With over 15 years of experience installing WEKO-SEAL units all over the globe, Jeremy is an expert in internal pipe joint sealing and repair. In his current role, Jeremy is responsible for coordinating crews, estimating projects, and working with clients to meet their needs. Jeremy lives for his amazing wife and their four children. 

Applied & Bonded Epoxy Lining: When to Use in Large Diameter Pipe

Define an ultra-high build, applied & bonded structural epoxy lining technology and how it differs from other lining technologies. 

Mike Caputi

  • CEO of Epoxytec prior to Tnemec’s acquisition in 2021
  • In the coating industry since 2001
  • Former co-chair of NACE S. Florida Section
  • NACE Certification for Coating Inspection
  • SSPC Certification for Concrete Coating Inspection
  •  Participates in Epoxytec’s technical authoring, and with committees involving coating design, rehab methods, and structural lining design.

Use of FRP Composite for Pipe Rehab

The goal of this presentation is to educate the audience on the fundamentals of pipeline rehabilitation with FRP including materials, design, installation, and QA/QC processes applied in a typical project.

Firat Sever

Pipeline Division Manager at QuakeWrap, Inc. | Worked as a field engineer and consulting engineering pipelines for 15 years, before joining QuakeWrap in 2018 | Serving on National Pipeline Committees of WEF, NASSCO, and AWWA | ASCE Pipelines 2015 Technical Chair | Specialties: Underground infrastructure rehabilitation with trenchless technologies, pipeline design.

Applied Cement/Geopolymer Rehab for Large Diameter Pipes

We will explore how and why spraying pipe can be an effective, durable and cost saving method for owners.  

Drew O'Connor

  • Vice President of MCSP
  • 14 years of experience in underground rehabilitation

Sealing the Lateral Connection of Large Diameter Mains

Jason Mathey

  • 14 years of experience in underground rehabilitation
Poster advertising a Water & Wastewater Safety Workshop with event dates, schedule blocks, sponsorship details, and a yellow safety icon.

Thank you for joining BMC Trenchless’ FREE Priority List.

Member Benefits:

  • Register 3 days before open webinar registration begins.
  • Guaranteed seating in all 1-hour education sessions.
  • Member ONLY education sessions.
  • First to know about new education sessions & events.
  • PDH/CEU Savings!